The questions that come up in nearly every Boston spray foam conversation, answered directly.
Closed cell is dense, adds structural strength, resists water vapor and delivers roughly 6.5 to 7 R-value per inch. Open cell is lighter, cheaper per inch, lets vapor through and delivers roughly 3.5 to 3.8 R-value per inch. The material follows the assembly, not the other way round.
Foam does not create moisture, but it can trap moisture that is already there. Spraying over damp wood or an active leak is how a job goes wrong. The preparation and a dry substrate are the parts that matter, which is why a contractor who wants to spray over a wet wall is a red flag.
Yes, and old houses are where it earns its price - rim joists, balloon-framed walls, furred masonry. The constraints are knob-and-tube wiring in the cavity, vermiculite in the attic, and lath-and-plaster walls that need a low-expansion material so the plaster does not crack.
Installed correctly it lasts the life of the building and does not settle or sag the way loose fill does. It can be damaged by UV if left exposed, which is one reason it gets a thermal barrier in occupied spaces.
The material is tested and rated as a component, and in most occupied spaces it must be covered with a thermal barrier such as drywall. Exposed foam in a basement ceiling is a common code question - ask what covering your assembly needs.
Thick enough to reach the target R-value for that assembly. An attic ceiling, a rim joist and a roof deck all have different targets. The number of inches is an output, not an input.
Air-sealing the ceiling plane removes the cause of most ice dams by keeping warm air out of the attic. The foam has to be part of an air-sealing scope, not sprayed over an open bypass.
Yes, particularly open cell in floor-ceiling assemblies. It is a real benefit in a triple-decker where the complaint is footsteps and conversation.
Insulation work in a one- to three-family home often proceeds without a building permit, but anything that changes the assembly - a new thermal barrier, structural repair, an attic conversion - can require one. Confirm with the Inspectional Services Department for your address before work starts.
Mass Save, funded by the utilities, offers insulation incentives and a heat loan for qualifying work, and the incentive depends on the assembly and the measured improvement. The contractor usually submits the paperwork - ask who submits it and what the rebate is worth before signing.
It reduces air leakage as well as conductive loss, so the effect is often larger than the R-value alone suggests. How much depends on what the house was doing before, which is why an audit before the work is worth the cost.
For closed cell in an attic or basement, most contractors ask you to stay out of the work area during spraying and for a few hours afterwards. Large jobs sometimes require the house to be empty for the day.
A faint odor for a day is normal. A sharp chemical smell that persists past 48 hours usually means an off-ratio mix and is the contractor's problem to correct, not something to ventilate away.
Over loose fill on a flat ceiling, sometimes, after air-sealing. Over failing batts in a rim or crawlspace wall, no - the old material hides the surface the foam has to bond to.
It has to be dealt with before spraying. Foam insulates the wire and traps heat, and knob-and-tube was never designed to be buried. An electrician's assessment comes first.
Vermiculite in a pre-1970 attic can contain asbestos and must be tested before it is disturbed. If it tests positive the work becomes abatement by a licensed contractor.
Not until the water is dealt with. Encapsulation manages ground vapor and humid air, not standing water. Fix the drainage first or the liner becomes a lid.
A rim joist and basement wall job is usually a day. An attic ceiling with air-sealing is one to two days. A full roof deck on a large house takes longer, and cure and trim add time after the spray.
Storage has to come out of the work area. The contractor needs clear access to the ceiling plane and the eaves, and masking protects what stays.
Interior insulation work is usually unaffected. Exterior-visible work in a local historic district needs review, and any change to a facade falls under that.
For the Mass Save incentive, an assessment by a participating contractor is normally part of the process. It is also the cheapest way to find out which assembly is actually worth doing.
It raises the temperature of the surrounding wall, which can shift where moisture condenses. Lower indoor humidity and mechanical ventilation handle the rest.
Wrong foam in a shallow cavity over lath can. A low-expansion material and controlled passes are what prevent it, which is why an installer who has done old Boston houses is worth waiting for.
Compare the assembly, the material, the installed thickness, the board feet, the R-value target and what preparation is included. If one quote does not name all six, it cannot be compared.